Measure A Project Status

CategoryAreaRIO MESA HIGH SCHOOLStatusCompleted
Site Safety & SecurityFencing and Barriers3Security ImprovementsKBZ preparing bid documents
Site Safety & SecurityAsphalt Paving7Parking Lot Pick-up, Drop-of, Flow & SafetyCompleted 2018
FieldsFields and Turf5Renovate Field Restrooms and Snack BarDesign documents with DSA
FieldsFields and Turf8Landscape Renovation at Front of SchoolNATT
FieldsFields and Turf9Artificial Turf Field at StadiumDesign documents with DSA
FieldsDrainage and Waste15Site Drainage ImprovementsDesign documents with DSA
HVACSite Electrical11Electrical Infrastructure UpgradesF&M preparing DSA submittal
HVACBuilding HVAC12New Window CoveringsF&M preparing DSA submittal
HVACBuilding HVAC17HVAC-New ThroughoutF&M preparing DSA submittal
Classroom Window Replacement AddedF&M preparing DSA submittal
Classroom LED Lighting AddedF&M preparing DSA submittal
ModernizationActivity and Performance2Phase 1 Modernization-GymNATT
ModernizationClassroom Support Areas6Cafeteria Kitchen Miscellaneous RenovationsNATT
ModernizationClassroom Renovation10Modernization-D, L, M, N, R, and U wingsNATT
ModernizationActivity and Performance13Stadium ModernizationNATT
ModernizationClassroom Renovation14Special Ed Classroom RenovationsNATT
ModernizationClassroom Renovation16Misc. Repairs in A and K WingsNATT
RelocateablesClassroom Replacement1Replace Relocateables Classrooms except R wing officesDesign documents with DSA
RelocateablesClassroom Replacement4New RestroomsDesign documents with DSA
OUHSD purchased buildings
Career Ed. Tech.Carreer Ed. Tech18MERIT Program H wing RenovationA4E/Kaplan assisting with CTE applications
Career Ed. Tech.Carreer Ed. Tech20Auto Shop Addition and RenovationA4E/Kaplan assisting with CTE applications
PACPerforming Arts Center19Small PACNATT